Morrisville Design Study
Pennsylvania Department of Transportation District 12-0
Trans Associates (TA) was contracted with PennDOT District 12-0 perform a corridor study of a congested segment of Route 19 in Greene County, which resulted in developing several design alternatives. The purpose of the design alternatives is to mitigate the traffic congestion and improve safety along S.R. 0019 in the business community of Morrisville. The project involves the relocation and/or widening of approximately 1,000 meters of roadway beginning near the intersection of S.R. 0019 and S.R. 0021 and terminating near the intersection of Woodland Avenue (T-728) and Green Street (S.R. 0019). TA led a design team to examine design alternatives for this multi-phased project.
Trans Associates services for this study included:
- Property investigation and field survey
- Extensive agency and public involvement
- Preliminary and detailed alternative analysis
- Preparation of draft and final Environmental Impact Study and environmental mitigation report
- Utility and PUC coordination
- Preliminary Soil Erosion and Sedimentation Control Plan and Hydrologic and Hydraulic Studies
- Design Field View (Step 9)
- Type, Size and Location (TS&L) Submission
- Foundation Submission
- Right-of-way plan preparation